Commercial & Industrial

Commercial & Industrial

 

Commercial & Industrial Energy Storage Solutions

 

Reduce energy costs, manage peak demand and improve power reliability with energy storage solutions designed around your facility's needs.

 

System capacity range

100 kWh – 2 MWh

Power Conversion Options

Flexible PCS Configurations

Containerized · Outdoor Cabinet · All-in-One

Multiple System Configurations

Who This Is For

 

Every commercial and industrial facility has different energy consumption patterns. Understanding your load profile is the first step toward choosing the right energy storage solution.

manufacturing-plant-production-hall

Manufacturing plant

Load profile: A combination of warehouse operations, refrigeration and EV charging, with varying demand throughout the day.
Cares most about: Demand charges and downtime losses

logistics-park-loading-docks-charging

Logistics park

Load profile: Refrigeration and charging loads, with a clear evening peak.

Cares most about: Peak/off-peak price gap and the cost of capacity upgrades

cold-storage-warehouse-refrigeration

Cold storage

Load profile: Continuous load around the clock. Small gap between peak and off-peak, large total consumption.

Cares most about: Product loss after a power cut, and supply reliability

commercial-rooftop-solar-bess-chillers

Commercial complex

Load profile: Air-conditioning led, with a sharp summer peak.

Cares most about: Demand charges and spare transformer capacity

The Three Costs You Are Already Paying

 

Most sites count one cost, the energy they buy. Two more sit on the same bill or behind it, and leaving them out is why storage can look like a poor investment on paper.

 

peak-shaving-demand-management

 

1. Energy charges (per kWh)

You pay for every kWh. Storage earns here by buying in cheap hours and using the power in expensive ones. The return depends on your peak/off-peak price gap and how many times a day the battery cycles.

 

2. Demand charges (per kW)

Where your tariff has a demand charge, you pay for your highest power draw in the billing period, not for how much you used. The maximum demand is measured according to the utility's billing interval, which varies by market. Reducing peak demand during critical periods may help lower demand-related electricity charges.

Where demand is billed, shaving peaks is often worth more than price arbitrage, because you only need to flatten a few dozen hours a year.

 

How to size the shave

1. Take 12 months of load data, in 15-minute intervals if you can get them.

2. Set a target maximum demand.

3. Power to cut (kW) = current maximum demand − target.

4. Energy needed (kWh) = power above target × hours, for your longest peak event, plus a margin for battery ageing.

Example: 800 kW maximum, 680 kW target. The PCS must deliver at least 120 kW. If the worst peak averages 90 kW over target for 2 hours, you need about 180 kWh usable.

 

3. Outage losses

A stopped line, a broken cold chain, a scrapped batch. This is the hardest cost to quantify and often the real reason for the purchase. Put your own number on it:

 

Cost of one outage = hours down × (lost output per hour + restart cost) + scrapped stock

 

Site

What one outage costs

Manufacturing plant

Idle line hours and scrapped work in progress: [loss per hour]

Logistics park

Spoiled refrigerated cargo and lost charging service: [loss per event]

Cold storage

Product value of one chamber: [value per tonne × tonnes]

Commercial complex

Tenant disruption and emergency response: [cost per day]

 

Three Form Factors: Container, Outdoor Cabinet or All-in-One

 

Check one line before you compare prices: does the quote include the PCS?

 

 

Container

Outdoor cabinet

All-in-one cabinet

Typical capacity

0.5–2 MWh

Multiple capacity options

Multiple capacity options

PCS included?

Yes, 250–1000 kW

Usually not; supplied separately

Yes, with EMS and fire protection

DC voltage

800 V DC

Model-dependent

Model-dependent

Footprint

20 ft pad plus lifting access

Single cabinet on the floor

Single cabinet on the floor

Fire protection

Integrated fire detection and suppression system, depending on the model.

Model-dependent

Integrated protection system

Delivery

Whole container by sea; longest lead time

Shorter

Shorter

Best for

Park-level, MW-scale peak shaving

A single building, phased rollout

Small sites that want one package

 

A container quote includes the PCS. An outdoor cabinet is usually quoted as battery only, with the PCS and EMS priced separately. An all-in-one cabinet integrates the main system components into one solution. Actual equipment configuration and supply scope may vary by model. Always compare the included components when evaluating different quotations.

Compare them side by side only after you have lined up what each price covers.

 See the container ESS pages for datasheets.

 

cabinet-three-types-combined-

 

commercial-storage-quotation-scope

 

Peak Shaving Battery Storage: How We Size a System

 

A suitable energy storage system should be configured according to your facility's electricity consumption and operating requirements. The following four inputs help us make an initial assessment.

 

Input

Where to find it

What it decides

Transformer capacity

Transformer nameplate or your utility contract

Whether you need a grid upgrade

Electricity load profile

Utility portal or meter data; 12 months of bills at minimum

Battery energy (kWh) and peak length

Maximum demand

Your bill, in kW or kVA

PCS power rating

Peak/off-peak periods

Your tariff sheet

Charge and discharge schedule

 

storage-sizing-workflow

 

Factory rooftop solar: add it second

If you have roof space, factory rooftop solar can charge the battery and cut energy charges. On its own it can miss the demand peak, which often falls in the morning start-up when the sun is low. For some facilities, battery storage can be installed first, with rooftop solar integrated later. The optimal configuration depends on the site's electricity demand, available roof space and energy cost structure. 

 

Demand Charge Reduction and Payback: What Drives the Return

 

We don't promise a payback period. Tariffs differ too much between countries for any single figure to hold. Four variables decide the return:

Peak/off-peak price gap

Sets the value of each shifted kWh.

Cycles per day

How often the battery earns that gap.

Demand rate

The price per kW per month, if your tariff has one.

Local incentives

They change often, so we link to current guides instead of listing them.

Yearly arbitrage = usable kWh × cycles per day × operating days × (peak price − off-peak price) × round-trip efficiency

Yearly demand saving = kW shaved × demand rate per kW per month × 12

Simple payback (years) = system cost ÷ (arbitrage + demand saving + other income)

 

Illustration, not a quote: 120 kW shaved at 12 per kW per month saves 17,280 a year. A 200 kWh battery cycling once a day for 300 days on a 0.10 price gap at 90% efficiency adds 5,400. Total: 22,680 a year, before any incentive.

 

Grid Connection and Compliance

 

Rules differ by country and the utility has the final say. This is the usual shape.

 

Typical pattern

Low-voltage connection

Medium-voltage connection

System size

Up to a few hundred kW

Larger systems, often MW-scale

Connection point

The building's low-voltage board

Medium-voltage side, through a step-up transformer

What the utility reviews

Protection settings and export limits

Grid impact study, protection coordination, often a witnessed test

 

The permit route

1. Pre-application with the utility.

2. Grid study and connection agreement.

3. Protection settings agreed.

4. Witnessed commissioning test.

5. Permission to operate.

Fire approval is a separate track with the local fire authority. We supply the system description and test documents.

 

single-line-diagram-lv-mv

 

Safety and Fire Protection

 

Fire safety is the first concern for most site owners. We protect at three levels, on the assumption that a single cell can fail.

 

Level

Guards against

Measures

Cell

One cell going out of range

BMS monitors the voltage and temperature of every cell and trips the circuit on a fault

Cluster

A fault spreading between racks

Each cluster is isolated by its own protective devices, with temperature sensing

Cabinet

Fire, gas build-up and pressure

In-cabinet gas suppression (FM-200 / Novec), combustible gas detection and pressure relief design

 

The documents for fire approval are listed in the FAQ below.

 

three-tier-fire-protection

 

Delivery and Commissioning

 

A container ships whole. Here is the path from order to operation.

 

#

Step

What happens

1

Engineering

We confirm the size from your load data and issue site drawings.

2

Factory build and test

The container is assembled and tested before it ships.

3

Shipping

Whole container by sea.

4

Site works

Pad, cable routes and the grid connection point, prepared by you or your EPC.

5

Commissioning

On-site tests, EMS connection and grid sign-off.

6

Training

Operator training for your maintenance team. [On site or remote]

 

What we need from your site

Foundation

A level pad built to our drawing.

Access

A route and space for lifting equipment.

Power

Connection point and cables ready to the agreed boundary.

Network

A wired link for monitoring.

Permits

Grid and fire approvals in hand before power-on.

People

An electrician from your side at commissioning.

Planning to grow later? Prepare the pad and cable capacity for the final size now, install the first container, and add the rest when you need it.

 

project-delivery-timeline-

 

FAQ

Q: Do I need a new transformer?

A: Usually not for peak shaving. The battery supplies the peak, so the draw on the transformer stays lower. Transformer work comes into play when you are adding load.

Q: Can I install storage without solar?

A: Yes, and many customers start that way. Storage alone cuts demand charges and shifts energy. Solar can follow.

Q: How long will the battery last?

A: [6000cycles] to [80%] of original capacity under [depth of discharge and temperature]. Warranty: [10 years]. Real life depends on how often you cycle and on site temperature.

Q: What do I need for fire approval?

A: Usually a site layout with clearances, the fire protection design, the extinguishing agent datasheet and [large-scale fire test report]. Your local fire authority sets the final list.

Q: Can I add capacity in phases?

A: Yes. Containers suit a plan made up front: prepare the pad and cable capacity for the final size, install one now, add more later. Cabinets can be added one by one.

Q: Can it connect to my energy management system?

A: Through [protocols, e.g. Modbus TCP, IEC 104, MQTT]. Send us your system's interface requirements and we will confirm.

Q: Can it power my site in an outage?

A: Grid-connected mode shaves peaks and shifts energy. Backup mode carries selected loads when the grid fails, within the limits of battery and PCS power, and the system must be configured for it. [Confirm backup availability per model]

Q: How is the warranty handled?

A: [Replace / repair] under warranty, with a response time of [24 hours] .

 

 

page-800-600

Get a Load Assessment

Five details are enough for a first assessment, and you probably have them to hand. A commercial and industrial solar storage project is much easier to size once we see your bill.

  • Industry
  • Transformer capacity (kVA)
  • Monthly electricity bill range
  • Peak/off-peak price gap
  • Do you need backup power?
 

Need MW-scale storage? See Utility & Infrastructure →

Adding EV chargers? See Mobility & Charging →